RDI

Workflow pack

Subcontractor Performance

Support labour verification, invoice disputes, quality checks, attendance records, and package-level performance conversations.

Primary readers

Commercial manager, Package manager, Quantity surveyor

RDI loop

Problem, evidence, decision, outcome

Use the same structure across every pack so the category remains comparable across site problems.

  1. 01

    Trigger

  2. 02

    Evidence

  3. 03

    Interpretation

  4. 04

    Action

  5. 05

    Outcome

  6. 06

    Measurement

A workflow is complete only when the final measurement can improve the next decision.

Signal

Reference depth

The ledger signal shows how much active workflow and evidence depth sits behind this pack.

Active workflows
6
Evidence records
123
High confidence
5
Very common
3
Cost models
5

Value

Why this pack matters

The value case is grounded in evidence quality, decision speed, and measurable project outcomes.

Subcontractor performance turns captured reality into commercial evidence when teams need to verify what was done, when, and by whom.

Example metrics

  • Payment accuracy
  • attendance verification
  • quality evidence

Workflows in this pack

Very Common / HighSubcontractor Invoice & Payment Dispute Resolutioncloud recordings, local HFR recordings, and Gate Report ANPR data provide the primary independent evidence base for resolving billing disputes — verifying whether work was performed, materials delivered, quantities matched claims.Trigger: A subcontractor, supplier, or haulier submits an invoice or payment application containing claims the main contractor's QS believes are inaccurate, duplicated, inflated, or relate to work not performed.Outcome: The invoice or payment application dispute is resolved. The main contractor pays only what is legitimately due. Court action or adjudication is avoided.40evidence10stepsEmodelVery Common / HighSubcontractor Labour & Attendance Verificationcloud recordings, the Recordings tab, and Gate Report ANPR data are used to verify subcontractor worker attendance — confirming arrival and departure times, headcounts, and overtime or weekend working claimed in labour returns.Trigger: A subcontractor submits a labour return, daywork sheet, overtime claim, or payment application that the main contractor's PM or QS believes may be inflated, inaccurate, or unverifiable.Outcome: The labour claim is verified or refuted by footage evidence. Dispute resolved without escalating to formal adjudication.40evidence10stepsEmodelVery Common / HighSubcontractor Work Quality & Defect Verificationthe evidence system camera footage and 360° captures used to document and verify the quality of subcontractor work — providing timestamped visual evidence of defects, rework, and non-conformances for formal quality management processes.Trigger: A quality inspection, milestone completion check, or defect liability dispute triggers the need to verify the condition of subcontractor work at a specific point in time.Outcome: Work quality is confirmed or defects are identified, documented, and assigned to the responsible subcontractor for remediation.20evidence9stepsEmodelCommon / HighPay Application / Progress Claim Visual Verificationcloud recordings and snapshot tools used to cross-reference visual state of works against percentage-complete claimed in subcontractor's monthly pay application.Trigger: Subcontractor submits monthly pay application asserting percentage of work complete that the main contractor's QS believes may be overstated or inconsistent with recent observations.Outcome: Pay application certified at face value (with visual confirmation), adjusted downward with evidenced justification, or returned for revision.10evidence10stepsEmodelCommon / HighSubcontractor Plant & Equipment Utilisation Verificationthe evidence system fixed camera recordings and Gate Report ANPR data used to verify whether specific plant/equipment items were physically present on site and actively deployed during periods invoiced.Trigger: Subcontractor/plant hire company submits invoice for plant utilisation on day-rate/time-rate basis; main contractor's QS/PM believes charged period includes time when plant was not on site or was idle.Outcome: Plant utilisation dispute resolved — invoice confirmed and paid, or reduced to reflect verified utilisation period.10evidence10stepsEmodelRare / LowUnion / Labour Compliance & Workforce Verificationcloud recordings and live camera feeds provide timestamped visual evidence of workforce composition, headcount, and on-site activity patterns — supporting union compliance verification.Trigger: A union compliance obligation, contractual workforce requirement, or production rate discrepancy prompts a review of on-site labour composition.Outcome: Workforce composition confirmed as compliant, or discrepancy identified, documented, and escalated.3evidence9stepsQqualitative

Evidence examples

Subcontractor Invoice & Payment Dispute Resolution

Trevor brought the subby into his office and showed him a video of what happened (on the evidence system), after which he returned the €70k. Trevor explained that if the video was not produced, the subby was willing to go to court.

Anonymized evidence record 7.1

Subcontractor Labour & Attendance Verification

Paul was able to use the Recordings tab to verify when his concrete sub got to site and when they left. He needed to verify that they worked 12 hours.

Anonymized evidence record 6.1

Subcontractor Work Quality & Defect Verification

Subcontractor work quality verified via recordings — footage used to back-check whether trade work was completed in the correct sequence and to specification before the next trade package commenced.

Anonymized evidence record 21-alt.1

Pay Application / Progress Claim Visual Verification

Visual verification of claimed work percentages via camera recordings used to support or challenge monthly payment applications — confirming the workflow's direct commercial application.

Anonymized evidence record 41-alt.1

Subcontractor Plant & Equipment Utilisation Verification

We had a crane hire company claiming an extra week of standby charges — about £18,000. We pulled up the Gate Report and the camera footage and showed them the low-loader collecting the crane on the Tuesday afternoon. The invoice was withdrawn the same day.

Anonymized evidence record 41.1

Union / Labour Compliance & Workforce Verification

Verifying workforce composition and union compliance through camera evidence — confirming the core workflow as a documented use case with distinct characteristics from general attendance monitoring.

Anonymized evidence record 52.1