RDI workflow
Weighbridge & Tipping Truck Workflow Monitoring
Currently, the evidence system does not have a native integration with weighbridge systems. The workflow represents a product development opportunity: integrating the evidence system's Gate Report ANPR with weighbridge data to automatically cross-reference truck identity, load weight, and tipping event against claimed tonnage.
- Category
- Specialist Capture & Emerging Technology
- Frequency
- Rare
- Confidence
- Low
- Evidence records
- 2
- Cost model
- Qualitative
Trigger, activity, conclusion
A bulk earthworks or demolition project is underway where a subcontractor is being paid on a per-load or per-tonne basis and the main contractor needs to verify claimed loads.
Cross-referencing camera-recorded truck arrival and departure events with weighbridge system records to verify that every claimed load is supported by a corresponding truck movement and valid weigh ticket.
A reconciled load count and tonnage record produced, confirming or identifying a discrepancy. Used to approve, adjust, or dispute the subcontractor's payment application.
Workflow steps
- Step 01
Bulk earthworks or demolition subcontract awarded on a per-load or per-tonne payment basis.
Inferred - Step 02
[Aspirational] the evidence system's Gate Report configured to capture all truck plate numbers and timestamps at the site gate.
Inferred - Step 03
[Aspirational] Weighbridge system records gross, tare, and net weight for each truck on each trip.
Inferred - Step 04
[Aspirational] Gate Report vehicle movement data exported and cross-referenced against the weighbridge weigh ticket log — matching plate numbers and timestamps.
Inferred - Step 05
Discrepancies identified: trucks in Gate Report without a corresponding weigh ticket, anomalously low net weights, or ticket sequences that do not match observed trip counts.
Inferred - Step 06
Camera footage at the tipping or loading area reviewed for flagged truck events to visually confirm whether a full tipping event occurred.
Inferred - Step 07
Reconciliation report produced — confirmed loads, flagged discrepancies, adjusted tonnage total — presented to the subcontractor with supporting evidence.
Inferred - Step 08
Subcontractor's payment application approved at the reconciled tonnage figure; overpayment recovered or deducted from the next application.
Inferred
Evidence records
Weighbridge integration aspiration documented — a desired workflow in which the evidence system cameras and weighbridge systems are integrated to verify truck loads — confirming this as a tracked feature development opportunity with a clear commercial use case in bulk earthworks projects.
the evidence system's Gate Report ANPR capability already provides the vehicle identification and timestamp layer that forms the basis of this workflow; the gap is the weighbridge data integration, not the camera infrastructure.
Per-tonne and per-load payment structures are standard on civil earthworks and demolition subcontracts; over-claiming on truck loads is a well-documented industry problem that automated camera-weighbridge reconciliation would directly address.
ROI model
Qualitative workflow
This workflow is currently represented as a qualitative benefit. A parametric cost model should be added only when the assumption set is credible.