RDI

RDI workflow

Post-Project Close-Out & Handover Documentation

the evidence system's accumulated project record (cloud recordings, time-lapse, 360° capture, drone imagery, compare-tool snapshots) compiled and packaged as formal close-out/handover documentation.

Category
Progress Tracking & Documentation
Frequency
Common
Confidence
High
Evidence records
20
Cost model
Qualitative

Trigger, activity, conclusion

01 · Trigger

Project reaches practical completion; contractor must assemble and hand over documentation. Or post-completion defect/dispute triggers retrieval of footage archive.

02 · Activity

Compiling and packaging full visual record — time-lapses, 360° archives, drone outputs, milestone clips — into structured close-out deliverable for client.

03 · Conclusion

Close-out visual documentation package formally delivered to client. Footage archive remains accessible for the agreed retention period.

Workflow steps

  1. Step 01

    Practical completion certified or sectional completion milestone reached; close-out process initiated.

    Inferred
  2. Step 02

    Project team reviews the evidence system archive to confirm coverage and identify gaps.

    Inferred
  3. Step 03

    Time-lapse video generated from Media Hub — compressing construction into shareable video.

    Evidenced
  4. Step 04

    Key milestone footage clips identified and extracted.

    Evidenced
  5. Step 05

    360° capture archive reviewed and organised by date/location.

    Evidenced
  6. Step 06

    Drone survey outputs collated and linked to project record.

    Evidenced
  7. Step 07

    Compare tool used to generate before/after image sets from defined milestone dates.

    Inferred
  8. Step 08

    All visual assets compiled into structured handover package.

    Evidenced
  9. Step 09

    Handover package presented to client at practical completion meeting.

    Inferred
  10. Step 10

    the evidence system project record retained under defined archive policy for defect liability period.

    Inferred
  11. Step 11

    In event of post-completion defect, archived footage retrieved for investigation.

    Inferred

Evidence records

Project time-lapse video compiled from the full duration of recordings and delivered to the client as part of the handover package — described as one of the most valued deliverables by the client, used for internal communications and external marketing.
Anonymized evidence record 25.1
360° capture archive retained post-completion and accessed by the facilities management team to understand the routing of concealed services and the as-built condition of structural elements — demonstrating the operational value of the archive beyond the construction phase.
Anonymized evidence record 25.2
Full footage archive retrieved post-completion following a latent defect claim — the timestamped recordings established the as-built sequence and condition at practical completion, enabling the contractor to defend against an allegation that the defect was present at handover.
Anonymized evidence record 25.3

ROI model

Template B

automated content

Evercam eliminates manual effort for recurring content production (progress photos, time-lapse, marketing videos). The baseline cost is the manual time per deliverable × frequency.

Formula

saving = manual_hours_per_deliverable × deliverables_per_month × project_duration_months × hourly_rate × evercam_reduction_pct