RDI

RDI workflow

Before / After Progress Documentation

the evidence system's Compare tool allows users to select two images from the same camera at different dates and display them side-by-side or as a slider overlay — the primary mechanism for before/after progress comparison.

Category
Progress Tracking & Documentation
Frequency
Common
Confidence
High
Evidence records
10
Cost model
Qualitative

Trigger, activity, conclusion

01 · Trigger

Site manager/PM/client/engineer needs to demonstrate change in site conditions between two dates — to show progress, evidence disputed scope, document an RFI-relevant condition change, or prepare a stakeholder presentation.

02 · Activity

Using the evidence system's Compare tool to select and present two timestamped images from the same camera at different dates.

03 · Conclusion

Before/after comparison produced, reviewed, and used for its intended purpose. Comparison screenshot archived in project record.

Workflow steps

  1. Step 01

    Need for before/after comparison identified — for a meeting, a report, a dispute, or an RFI.

    Inferred
  2. Step 02

    User accesses the evidence system platform and navigates to relevant project/camera.

    Evidenced
  3. Step 03

    Compare tool opened and first reference date selected.

    Evidenced
  4. Step 04

    Specific image from archive for that date selected.

    Evidenced
  5. Step 05

    Second date selected.

    Evidenced
  6. Step 06

    Compare tool displays images in side-by-side or slider overlay format.

    Evidenced
  7. Step 07

    Comparison reviewed for intended purpose.

    Inferred
  8. Step 08

    Comparison exported as screenshot or shared via link.

    Evidenced
  9. Step 09

    Comparison output archived in project document management system.

    Inferred

Evidence records

I use the Compare tool every single week for the client report. I pick the same camera position, the same approximate time of day, and I compare this week to the same week last month. It takes two minutes and it's the most powerful page in the whole report — clients can see exactly what's been built.
Anonymized evidence record 40.1
Visual progress documentation is a contractual requirement on most construction contracts — owners and clients require regular demonstration that the programme is being maintained and that work-in-progress corresponds to payment applications. The Compare tool transforms this from a manual photography and editing task into a one-minute platform operation.
Anonymized evidence record 40.2
Before/after visual evidence is a standard component of construction dispute packages — used in adjudication, arbitration, and expert witness reports to demonstrate the state of the works at a specific point in time. the evidence system's timestamped archive provides an independently verifiable record that is difficult to challenge.
Anonymized evidence record 40.3

ROI model

Template B

automated content

Evercam eliminates manual effort for recurring content production (progress photos, time-lapse, marketing videos). The baseline cost is the manual time per deliverable × frequency.

Formula

saving = manual_hours_per_deliverable × deliverables_per_month × project_duration_months × hourly_rate × evercam_reduction_pct